                                              NMSIG-94/379

       MINUTES OF THE 6TH PT27 MEETING, OCTOBER 1994


>From Graham.G.Knight@level-7.co.uk Thu Oct 20 13:05:20 1994
From: Graham.G.Knight@level-7.co.uk (Tel +44 344 867199)
To: pt27@titn.alcatel.fr, jgg@cc.bellcore.com, claudio.teisa@cselt.stet.it,
        Roland.Kuhn@DANET-GMBH.DANET.d400.de, isabelle.valet@vbo.digital.fr,
        kskim@vision.etri.re.kr, bal@iitb.fhg.de, saenger@iitb.fhg.de,
        nakawaji@sy.isl.melco.co.jp, csg@national-computing-centre.co.uk,
        teshiga@tink.epc.ho.nec.co.jp, brusil@osi.ncsl.nist.gov,
        mikek@huachuca-jitcosi.army.mil, thomask@cc.ims.disa.mil,
        756293@twnmoctl.bitnet,
        "/I=GS/S=VERMEER/O=PTT RESEARCH/PRMD=PTT RESEARCH/"@400net.nl,
        dpc@sema-itf.fr, WTSAI@TWNMOCTL.EARN,
        "/G=HUY/S=TRUONG/OU=6127/O=TANDEM COMPUTERS/PRMD=TANDEM/ADMD=TELEMAIL/Ck
Cc: EWOS@sp1.y-net.be, das@national-computing-centre.co.uk
Subject:  PTN027 Minutes

 
PTN027/MTG/15
 
Minutes of the 6th PTN027 Meeting held during Thursday 13th October
and Friday 14th October 1994.
 
PRESENT:   Dr Yoshimi Teshigawara, AOW
           Mr Whey-Hsing Tsai, AOW
           Ms Marianne Delaire, ATA
           Mr Claudio Teisa, CSELT
           Mr Roland Kuhn, Danet
           Ms Isabelle Valet-Harper, EWOS EGNM
           Mr Wolfgang Ballin, FhG
           Mr Robert Saenger, FhG
           Mr Graham Knight, Level-7 Ltd
           Dr Christian Goswami, NCC
           Mr Joe Ghetie, OIW
           Mr Gert Vermeer, PTT-NL
           Ms Gwen Rolland, SGT
 
CC:        Dr Tetsuo Nakakawaji, AOW
           Mr Kwong-Soo Kim, AOW
           Mr Gary Tzeng, AOW
           Dr Luc van den Berghe, EWOS
           Dr Paul Brusil, OIW
           Mr Mike Kutch, OIW
           Ms Kim March-Force, OIW
           Mr Huy Truong, OIW
 
 
1     APPROVAL OF LAST MINUTES (PTN027/MTG/13)
 
No comments had been received.
 
 
2     ACTIONS FROM LAST MINUTES
 
Reference             Status
 
MTG2/ACTS/02          Final PTN027 outputs would be put up on the EIS
                      accessible using FTP.
 
MTG4/ACTS/02          Email with ATA now established.  Closed.
 
MTG5/ACTS/01          Outstanding.  QA03 will be updated with final PTS.
 
MTG5/ACTS/02          Each TSD to provide information to Level-7 by
                      24/10/94.
 
MTG5/ACTS/03          PTT-NL011 forwarded to AOW and OIW.  Closed.
 
MTG5/ACTS/04          NCC's deliverables confirmed as complete save for
                      input to DEL01 and QA03.  Closed.
 
MTS5/ACTS/05          SGT have provided ACSE information for DEL001.
                      Closed.
 
MTG5/ACTS/06          ATA/CSELT/FhG/NCC to provide information to Level-
                      7 by 24/10/94.
 
MTG5/ACTS/07          Comments in ATA010 taken care of in FHG/007
                      version 1.7 (see FHG/023).  Closed.
 
MTG5/ACTS/08          Examples being provided by PTT-NL.
 
MTG5/ACTS/09          This was an EG CT work item.  Outside scope of PT.
                      Closed.
 
MTG5/ACTS/10          Outstanding for Presentation and ROSE (to stage
                      5).
 
MTG5/ACTS/11          Complete.  Closed.
 
MTG5/ACTS/12          Complete.  Closed.
 
 
3     PROJECT STATUS
 
Proposed Status Report PTN027/PRO/08 was circulated for comment and
was approved.
 
 
4     PRESENTATION
 
The Presentation ATS had only just arrived in TAIPEI (though it had
been available within INTAP earlier).  Both AOW and OIW accepted the
Presentation work.
 
DAN026 version 2 reviewed.  Documents CSELT/HARMON001, CSELT/002,
CSELT/003, CSELT/004, CSELT/005, CSELT/007, CSELT/012 and CSELT/016
would not be included as part of the PSTS deliverable but would be
provided to EWOS as output from the project.
 
The Presentation ATS would have to be further updated to reflect
comments contained in DAN007-3.  When checked by QA (DAN007-4) this
would them be complete.
 
CSELT had updated CSELT018 to version 2 which was presented at the
meeting.
 
All work will complete by 24/10/94.
 
 
5     TEST MANAGEMENT PROTOCOL
 
All comments now accommodated (or rejected with acceptance of
originator):
 
-     DAN022 (FhG response in FHG/016)
-     INTC-055 (FhG response in FHG /017)
-     FHG/011 proposal (FHG/018)
-     PTT-NL010 (FhG response FHG/019)
-     AOW document N898 (accepted but no formal response).
 
It was agreed not to add an explanation concerning an inactivity
timer.
 
The final version of FHG/012 (version 1.2) was circulated at the
meeting on Friday 14th October 1994.
 
 
6     ROSE
 
ATA advised that not all the ROSE-USER tests were covered by the CMIP
ATS.  An ATS/TSS/TP set for ROSE-USER was required therefore (albeit
small).
 
The roadmap was agreed as follows:
 
-     ROSE TSS/TP and ATS to be delivered to PTT-NL by ATA by 17/10/94
-     PTT-NL to QA it 18/10/94
-     PTT-NL would forward to AOW and OIW 19/10/94
-     AOW and OIW would confirm acceptance by 26/10/94.
 
All ROSE work to complete by 31/10/94.
 
 
7     CMIP ASN.1
 
Document DAN026 version 2 was reviewed.  The CMIP ASN.1 ATS required
some additional changes to accommodate comments contained in DAN019-2.
This would be available by 21/10/94.
 
Information related to the IXIT (DEL001) should be provided to ATA
(and Level-7).
 
The CMIP ASN.1 work was accepted by AOW and OIW.
 
All work will complete by 24/10/94.
 
 
8     CMIP
 
8.1   TSS/TP (FHG/017 version 1.5)
 
Comments had been received and were responded to as follows:
 
-     DAN023 (FhG response FHG/020)
-     AOW email dated 12/8/94 (FhG response FHG/021)
-     AOW NM N897 (FhG response FHG/022)
-     ATA/010 (FhG response FHG/023)
 
There were no points of disagreement and version 1.7 of FHG/007 was
distributed at the meeting on Friday 14th October.
 
 
8.2   ATS
 
Comments had been received as follows:
 
-     AOW NM N899R2
-     INTC006 (covered by NM N899R2 above)
-     AOW NM N908 (received 11th October)
-     CSELT paper
-     PTT-NL006.
 
ATA and FhG would work through these and respond.  (ATA had already
covered PTT-NL006 in ATA019 dated 22/7/94 but neither PTT-NL or Level-
7 had received it).
 
The naming conventions had not been 100 percent applied due to the
time involved particularly to convert the test cases inherited from
CTS3.  This would be an "exception" in the final report.
 
The roadmap was that the ATS comments would be worked through by ATA
and FhG by 21/10/94.  CSELT and FhG ATS parts would be provided to ATA
by 21/10/94.  ATA would complete merged ATS by 31/10/94.
 
 
8.3   Test Purpose Selection
 
Comments had been received:
 
-     INTC001
-     PTT-NL009 (responded to in ATA019 version 2).
 
All comments had been accepted.  ATA015 would be updated and reissued
(version 2).
 
All work can complete by 31/10/94.
 
 
9     SESSION
 
The Session deliverables had been finalised on 31st August, having
taken account of comments from AOW.  Final copies had been provided by
NCC to Level-7 and PTT-NL (who in turn had redistributed them to AOW
and OIW).
 
Only actions MTG5/ACTS/02, MTG5/ACTS/06 and MTG6/ACTS/11 and 12 were
outstanding.
 
All work would complete by 21/10/94.
 
 
10    ACSE and ACSE ASN.1
 
The ATS was nearing completion; the outstanding points of
clarification were cleared up between SGT and Danet.
 
An AOW comment INTC007 was received by fax on the day of the meeting.
This was accepted by SGT and would be addressed in the final release
which would be produced by 24/10/94.  Danet could then reissue DAN013
at version 4.  Information should be included to assist the test
realiser.  SGT had provided their input to DEL001; copies of the
appropriate pages were passed to Danet.
 
SEMA/006 - ACSE PCTR was made available at the meeting.
 
Reference to SEMA/03 should be deleted from DAN026.
 
All work would complete by 24/10/94.
 
 
11    NEXT STEPS
 
 
The PTN027 Final Report should be made available to the EWOS
Secretariat by Monday 24th October so that it could be included in the
second TA mailing on Friday 28th October.
 
Simultaneous to this activity the technical work would continue to
complete by the 31st October.
 
Danet and PTT-NL would spend 4th November at Level-7 to produce the
final deliverables to be produced for EWOS.
 
There would be a 5-10 minute presentation required by the project to
the TA on the 22nd/23rd November.  Wolfgang Ballin offered to do this
using the overheads produced by the Project Manager.
 
 
12    CLOSING REMARKS
 
12.1  AOW - Dr Yoshimi Teshigawara
 
Dr Teshigawara thanked the PT for its efforts and advised that the PT
output could be approved informally at the AOW plenary to be held on
4th November with formal endorsement following in December.
 
12.2  OIW - Mr Joe Ghetie
 
Me Ghetie also thanked the PT and advised that OIW would be in a
position to endorse the PTN027 work in November informally with formal
endorsement following in December.
 
12.3  EGNM Chair - Ms Isabelle Valet-Harper
 
Ms Valet-Harper thanked the PT, particularly AOW and OIW for their
contribution.
 
12.4  FhG - Mr Wolfgang Ballin
 
Mr Ballin raised the issue of PTN027 maintenance and it was agreed
this would be an open item to be included in the Final Report.
(Roland Kuhn gave a presentation on "Procedures for Maintenance of
Test Specifications in EWOS" which was an EWOS work item with which he
was involved).
 
 
The PTN027 Project Manager thanked the Project members particularly
AOW and OIW for attending the meeting.
 
The meeting closed at 12:30.
 
 
 
 
 
Graham R Knight
20 October 1994
 
PTN027 ACTION LIST
 
1     CARRIED FORWARD ACTIONS
 
Reference        Action                     Responsible      Complete by
======================================================================
MTG2/ACTS/02     Put PTN027 output          Level-7          20/11/94
                 up onto EIS.
 
MTG5/ACTS/01     Update QA03 for TSDs       PTT-NL           21/10/94
                 to complete (taking
                 into account of
                 SGT comments).
 
MTG5/ACTS/02     Provide input to           ATA/CSELT/       28/10/94
                 Level-7 for QA03.          FhG/NCC/SGT
 
MTG5/ACTS/06     Provide specific           ATA/CSELT/       28/10/94
                 technical input to         FhG/NCC
                 Level-7 re DEL001.
 
MTG5/ACTS/08     Include in QA report       PTT-NL           19/10/94
                 for CMIP ATS a
                 (selection) of
                 specific test cases
                 reviewed.
 
MTG5/ACTS/10     Advise final TP            CSELT/ATA        21/10/94
                 coverage (stage 5
                 complete).
 
 
 
2     NEW ACTIONS
 
Reference        Action                     Responsible      Complete by
======================================================================
 
MTG6/ACTS/01     Complete final version     CSELT            19/10/94
                 Presentation ATS to
                 reflect comments from
                 Danet (DAN007-3).
 
MTG6/ACTS/02     Accept final               Danet            21/10/94
                 Presentation ATS
                 (DAN007-4).
 
MTG6/ACTS/03     Prepare final DAN026       Danet            31/10/94
                 (version 3) when all
                 work complete.
 
MTG6/ACTS/04     Check with JMB (ICL)       Danet            19/10/94
                 on status of
                 Presentation PICs and
                 advise CSELT.
 
MTG6/ACTS/05     Accept ROSE TSS/TP         AOW/OIW          26/10/94
                 and ATS.
 
MTG6/ACTS/06     Produce all ROSE           ATA              28/10/94
                 related PTS document-
                 ation (DEL001, QA03, etc).
 
MTG6/ACTS/07     Update CMIP ASN.1          CSELT            21/10/94
                 ATS.
 
MTG6/ACTS/08     Accept final CMIP          Danet            25/10/94
                 ASN.1 ATS.
 
MTG6/ACTS/09     Produce CMIP ASN.1         CSELT            21/10/94
                 PCTR (CSELT020).
 
MTG6/ACTS/10     Advise ATA/FhG of TC       PTT-NL           21/10/94
                 examples where naming
                 conventions had not
                 been applied.
 
MTG6/ACTS/11     Edit NCC/008 to strip      PTT-NL           21/10/94
                 out text prior to
                 test case tables and
                 update NCC disks.
 
MTG6/ACTS/12     Update NCC/009 file        NCC              21/10/94
                 and pass to Level-7
                 and PTT-NL.
 
MTG6/ACTS/13     Produce equivalent to      PTT-NL           21/10/94
                 DAN026 for CMIP,
                 Session and ROSE.